|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
RPCV |
Resistivity Phase Difference Borehole Inversion Corrected |
GRR_CDR |
Raw Gamma Ray Average |
BILI |
Bond Index Level for Isolation |
SDPS |
Smoothed Density Porosity |
PO7D |
Partial porosity from MRIL (single element) |
SGMA1 |
Complex sigma array 1 |
RACDL |
Resistivity Attenuation Compensated Borehole, Dielectric and Inversion Corrected Long 400kHz |
RACVL |
Resistivity Attenuation Compensated Borehole and Inversion Corrected Long 400kHz |
EC11FC |
MRIL filtered echo train packet 1 real |
TXXWV01 |
X-x axis dipole multiplex waveform |
RPCVH |
Resistivity Phase Diff Compensated Borehole and Inversion Corrected Long 2MHz |
PORD |
Bulk Density Porosity from DEN |
CBP2 |
CMR Bin Porosity 2 |
R4SL |
Resistivity derived from P4HS, R4AT, C4DE |
PEF |
Photoelectric Factor |
PO1 |
Partial porosity from MRIL (single element) |
PO6 |
Partial porosity from MRIL (single element) |
TRMTT06 |
Monopole multiplex first arrival time |
STPC |
APS Corrected Standoff Porosity |
AOVM |
Array Induction One Foot Volume Mud Filtrate |
ELTH3 |
MRIL the length of third echo data packet |
GMF1 |
Far GM Bank 1 Count Rate |
SFAN4 |
Surface pick first arrival time, T2R1 |
DT24.S |
Interval transit time over 24 inch interval (first break) |
CBF4_SL |
CMR Bound Fluid Volume for T2 Cutoff 4 - Station Log |
|
|
|
|
|
|