|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
GR2CX |
Gamma Ray from Detector 2, Borehole Corrected, Transmitted |
QP110 |
Acoustic pick quality curve |
P16H_UNC |
ARC Uncorrected Phase Shift Resistivity for 16 inch Spacing at 2 MHz |
SHK2_CDN |
CDN Shock Rate, over 50g |
PGAS |
HILT Gas-corrected Porosity |
AHT10 |
Array Induction Two Foot Resistivity A10 |
LATRM |
Computed mud resistivity |
RPCSL |
Resistivity Phase Diff Compensated Borehole Corrected Short 400kHz |
TRMWV01 |
Acoustic multiplex waveform |
TRMGN02 |
Monopole multiplex waveform gain |
HMFC |
Corrected HMFL |
HDRH |
High Resolution Density Correction |
SW |
Water Saturation |
BD2 |
Best Bin Bulk Density-Compensated (Real-time only) |
M4R2 |
4 foot vertical resolution matched res. - DOI 20 inch |
TTCO |
Transit Time at Compressional Peak Computed Downhole |
RXOI |
Invaded Formation Resistivity Very High resolution |
NRAT |
DSN (NDSN/FDSN) Ratio |
H1EP |
APS High Resolution Array-1 Detector Count Rate |
DTDF |
Delta-T Compressional Difference between DTRA and DTTA |
AMCO |
Amplitude at Compressional Peak Computed Downhole |
AHT30 |
Array Induction Two Foot Resistivity A30 |
SFXS |
Smoothed Density Formation Exposure Time |
HBHK |
HNGS Borehole Potassium Concentration |
CBF6 |
CMR Bound Fluid Volume for T2 Cutoff 6 |
|
|
|
|
|
|