|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
CHR1 |
Label Peak Coherence, Receiver Array - Lower Dipole |
P28H |
ARC Phase Shift Resistivity 28 inch Spacing at 2 MHz, Environmentally Corrected |
P22H |
ARC Phase Shift Resistivity 22 inch Spacing at 2 MHz, Environmentally Corrected |
MNSH |
Minimum Labeling Slowness, Shear |
TFAC |
Toolface from Impulse |
DT2 |
Delta-T Shear - Upper Dipole |
URAN |
Uranium Concentration |
CBP2_SL |
CMR Bin Porosity 2 - Station Log |
AHOD1 |
Array Induction One Foot Inner Diameter of Invasion (D1) |
ATCO20 |
Array Induction Two Foot Conductivity A20 |
P34H |
ARC Phase Shift Resistivity 34 inch Spacing at 2 MHz, Environmentally Corrected |
B1B |
B1 magnetic field strength (second TR) |
SBD3 |
Smoothed Worst Bin Bulk Density-Compensated |
PO5 |
Partial porosity from MRIL (single element) |
TE4 |
Time between echos in fourth data packet |
SHSI |
Smoothed Rapid Sampling Hole Size Indicator |
EN2 |
Vector amplitude of inter echo noise of frequency2 |
TAB_DEN |
Density Time After Bit |
DTLF |
Delta-T Long Spacing Far |
LLD |
Laterolog Deep Resistivity |
GMF1 |
Far GM Bank 1 Count Rate |
WF2I |
Filtered Waveform 2, 1/2-ft Averaged |
ECHOF |
Amplitude of echo train |
ABFR |
Array Induction Quality Control Borehole Formation Ratio |
T12R |
Computed T1/T2 |
|
|
|
|
|
|