Acronym |
Full Name |
RAC |
Resistivity Attenuation Borehole Corrected |
UB |
Volumetric Photoelectric Factor, Bottom |
P10H |
ARC Phase Shift Resistivity 10 inch Spacing at 2 MHz, Environmentally Corrected |
RUK |
Ratio of curves U/K |
STTA |
Slowness Time Projection, Transmitter Array |
POR_TOT |
Total Porosity (Gross) |
RG1B |
Ringing vector amplitude of frequency1 |
TTL3 |
Transit Time High Resolution Long Spacing 3 |
SPSD |
SP from electrode sub processed downhole |
SNDF |
Smoothed Near Detector ONLY Porosity (Dolomite Matrix-Fixed Hole Size) |
PO10 |
Partial porosity from MRIL (single element) |
HROM |
High Resolution Corrected Bulk Density |
CSGP |
Compensated SGP (RSGP - SGOF) |
CFF7_SL |
CMR Free Fluid for T2 Cutoff 7 - Station Log |
RPCEH |
Resistivity Phase Diff Compensated Borehole and Dielectric Corrected Long 2MHz |
ATCO20 |
Array Induction Two Foot Conductivity A20 |
M4R3 |
4 foot vertical resolution matched res. - DOI 30 inch |
FGA12 |
Fixed gate amplitude in cbl |
HAUD |
12 Raw Deep Resistivities before environmental corrections |
DI_HRLT |
HRLT Diameter of Invasion |
HCOC |
HNGS Formation Cobalt Concentration in pCi/g |
RPA |
Resistivity Phase Difference Apparent |
M0R1 |
True focused induction resistivity - DOI 10 inch |
SNSC |
Smoothed Near Detector ONLY Porosity (Sandstone Matrix-Caliper Corrected) |
AHFD1 |
Array Induction Four Foot Inner Diameter of Invasion (D1) |