|
|
|
|
Welcome to Petroleum Geology Forums
This is a free online community that aims to bring petroleum professionals and geologists together and share valuable knowledge. Registration is easy so become a member now for instant free access.
- Petroleum Geologists can stay up to date with industry related topics and exchange ideas and concepts.
- Upstream Oil and Gas Consultants get a chance to share their expertise and gain exposure to land future projects.
- Geology students and graduates can join the discussion and get into contact with potential future employees.
|
|
|
Petroleum Geology AcronymsBrowse through the Acronyms using the letters above or search for the acronym or it's description using the form below. If you have a acronym or abbreviation you would liek to see in this list please contact us.
|
|
Acronym |
Full Name |
AHO30 |
Array Induction One Foot Resistivity A30 |
RN3 |
Normal resistivity curve from V6 |
HEND_RT |
Near Helium Bank Total Counts, Real-Time |
FSOC |
APS Near/Far Porosity Standoff Correction |
RACEH |
Resistivity Attenuation Compensated Borehole and Dielectric Corrected Long 2MHz |
TNWV06 |
Acoustic multiplex waveform |
QSHFF |
Quality of shifted data |
AMP0_DIST |
Amplitude Distribution without Polarization Correction |
RMFA_HILT |
Apparent Mud Filtrate Resistivity from HILT Lithology Computation |
GOBO |
Good Bond |
HRSU |
HALS Uncorrected High Resolution Shallow Resistivity |
MRES_SL |
Mud Resistivity |
NPE |
Near Detector Only Photoelectric Absorption Factor |
HPDP2 |
HP differential pressure from 2nd HP |
GRRIX |
Data Density integrated, from RNT Gamma Ray, Transmitted |
RPCEL |
Resistivity Phase Diff Compensated Borehole and Dielectric Corrected Long 400kHz |
CHRA |
Coherence at Compressional Peak for the Receiver Array |
WFC |
Warning Flag for Compressional |
ELTH3 |
MRIL the length of third echo data packet |
GMN2 |
Near GM Bank 2 Count Rate |
PDER |
Time Since Drilled from MPR Phase Difference |
SGP |
Strain Gauge Pressure |
RXOZ |
Invaded Formation Resistivity filtered at 18 inches |
RPCDH |
Resistivity Phase Diff Compensated Borehole, Dielectric and Inversion Corrected Long 2MHz |
TTCO |
Transit Time at Compressional Peak Computed Downhole |
|
|
|
|
|
|